[2018 New Updated] 100% Pass Rate Microsoft 74-409 Dumps Windows Server 2012 Exam Video Q&As Online (Question 1 – Question 8)

Where can we download the newest 74-409 dumps, 74-409 exam and 74-409 pdf? pass4itsure 74-409 dumps pdf (Server Virtualization with Windows Server Hyper-V and System Center) is the part of Microsoft MCP certification. Passing Microsoft 74-409 exam in first attempt is easy with the help of Pass4itsure to become Microsoft certified. The Pass4itsure practice exam software offers you a real exam simulation for 74-409 Server Virtualization with Windows Server Hyper-V and System Center course exam.

Server Virtualization with Windows Server Hyper-V and System Center (Windows 74-409) is a qualifying exam for the Microsoft MCP certification. You can also be able to make use of the audio exam, video exam and brain dumps for 74-409 Server Virtualization with Windows Server Hyper-V and System Center coaching center is popular.

[2018 New Updated Pass4itsure 74-409 PDF Dumps From Google Drive]: https://drive.google.com/open?id=18sdyImWoGc8PsHpL6S6BUCHeDI7FxruI

[2018 New Updated Pass4itsure 74-409 PDF Dumps From Google Drive]: https://drive.google.com/open?id=14fBjnxAQ9DxW6704zhSaCemc5NPydZ0k

Exam Code: 74-409
Exam Name: Server Virtualization with Windows Server Hyper-V and System Center
Q&As: 343

Pass4itsure Latest and Most Accurate Microsoft 74-409 Dumps Exam Q&As(1-8)

QUESTION 1
A company has Windows Server 2012 R2 servers that have the Hyper-V role installed. The guest virtual machines are configured as follows:
74-409 dumps
You need to ensure that the environment supports online virtual hard disk resizing. What should you do?
A. Convert the virtual machines to Generation 2 virtual machines.
B. Deploy clustered storage spaces.
C. Convert the drive format of the virtual machines to the VHDX file format.
D. Deploy Serial Attached SCSI (SAS).
74-409 exam Correct Answer: C
Explanation
Explanation/Reference:
Requirements
The following functionality is required for resizing a virtual hard disk: A server capable of running Hyper-V. The server must have processor support for hardware virtualization. The Hyper-V role must be installed. ?A user account that is a member of the local Hyper-V Administrators group or the Administrators group.
The following functionality is required for resizing a virtual hard disk:
VHDX – the ability to expand and shrink virtual hard disks is exclusive to virtual hard disks that are using the .vhdx file format. Online resizing is supported for VHDX disk types, including fixed, differencing, and dynamic disks. Virtual hard disks that use the .vhd file format are not supported for resizing operations. ?SCSI controller – the ability to expand or shrink the capacity of a virtual hard disk is exclusive to .vhdx files that are attached to a SCSI controller. VHDX files that are attached to an IDE controller are not supported.

QUESTION 2
A company has seven Windows Server 2012 R2 virtual machines (VMs). The VMs are running and are accessible over the network. You plan to copy a large .ISO file from the host server to each of the VMs.
The copy operations must meet the following requirements:
The VMs must remain accessible over the network during the copy operations.
The copy operations must NOT use a network connection.
You need to configure the VMs. What should you do on each VM?
A. Enable the Guest services integration service.
B. Enable the Data Exchange integration service.
C. Add a network adapter, and then enable the virtual machine queue (VMQ) option on the adapters.
D. Set the value of the Smart Paging File Location property to %SYSTEMROOT%\temp.
Correct Answer: A
Explanation
Explanation/Reference:
Q: What is the new Guest services integration service in Windows Server 2012 R2 Hyper-V?
A: Several integration services are available for virtual machines (VMs) such as time synchronization, heartbeat, backup, OS shutdown, and data exchange. In Windows Server 2012 R2, a new integration service has been added, Guest services. Guest services enables the copying of files to a VM using WMI APIs or using the new Copy-VMFile Windows PowerShell cmdlet.

QUESTION 3
A company consolidates multiple data centers into a single centralized datacenter by using a Windows Server 2012 R2 server that has the Hyper-V role installed. You must be able to support chargeback based on the usage of the following resources:
average CPU usage per virtual machine (VM) average physical memory used by a VM over a period of time
highest amount of memory assigned to a VM over a period of time
highest amount of disk spaced assigned to a VM over a period of time
You need to track the resources without installing any additional tools. Which tool should you use?
A. Process Explorer
B. Resource Metering
C. Reliability Monitor
D. Resource Monitor
74-409 dumps Correct Answer: B
Explanation
Explanation/Reference:

QUESTION 4
A company has a Windows Server 2012 R2 server that has the Hyper-V role installed. The server has a single processor and a single 10-gigabit network interface card (NIC). 12 virtual machines (VMs) run on the server.You need to configure Hyper-V to allow higher network throughput and reduce processing overhead related to network operations. What should you do?
A. Run the Windows PowerShell command Set-VMNetworkAdapter -VmqWeight 0 on the VMs.
B. In Hyper-V Manager, disable the protected network option for all NICs on the VMs.
C. in Hyper-V Manager, enable the Single Root I/O Virtualization (SR-IOV) option on the VMs.
D. Disable Internet Protocol security (IPsec) task offloading on the VMs.
Correct Answer: C
Explanation
Explanation/Reference:
What is SR-IOV
Requires support in network adapter
Provides Direct Memory Access to virtual machines
Increases network throughput
Reduces network latency
Reduces CPU overhead on the Hyper-V server
Virtual machine bypasses virtual switch
Supports Live Migration, even when different SR_IOV adapters are used

QUESTION 5
You administer an environment that uses a Windows Server 2012 R2 Hyper-V cluster and System Center 2012 R2 Virtual Machine Manager (VMM). You plan to deploy two virtual machines (VMs) that host a line-of-business (LOB) application. The VMs must reside on the same Hyper-V host server at all times. The LOB application does NOT require high availability.
You need to deploy the VMs. What should you do?
A. Add a custom property to both VMs, and assign the same value to each property. Configure the Hyper-V host cluster to use the same custom property and value. Configure a custom placement rule that uses filters that are based on the custom property and value.
B. Configure the VMs to use the same VM network.
C. Configure the VMs to reside on the same storage area networks (SANs).
D. Add a custom property to both VMs, and assign the same value to each property. Configure the VMs as members of the same availability set.
74-409 pdf Correct Answer: A
Explanation
Explanation/Reference:

QUESTION 6
You are the virtualization administrator for an organization that manages private and public cloud-based resources. The organization uses Windows Server 2008 R2 SP1 Hyper-V. All Hyper-V host servers are configured as nodes in a four node cluster. The organization also uses System Center 2012 R2. Operating system updates to each host server require a system reboot. You need to ensure that the virtual machines remain online during any reboots required by the updates.
What should you do?
A. Apply updates by using the Virtual Machine Servicing Tool (VMST).
B. Configure orchestrated updates of Hyper-V host clusters in System Center 2012 R2 Virtual Machine Manager (VMM).
C. Implement cluster-aware updating with the Cluster-Aware Updating (CAU) wizard.
D. In System Center 2012 R2 Configuration Manager, add all of the servers to a collection.
Deploy updates to the collection.
Correct Answer: C
Explanation
Explanation/Reference:
CAU is an automated feature that enables you to update clustered servers with little or no loss of availability during the update process. During an Updating Run, CAU transparently performs the following tasks:
?Puts each node of the cluster into node maintenance mode
?Moves the clustered roles off the node
?Installs the updates and any dependent updates
?Performs a restart if necessary
?Brings the node out of maintenance mode
?Restores the clustered roles on the node
?Moves to update the next node
For many clustered roles (formerly called clustered applications and services) in the cluster, the automatic update process triggers a planned failover, and it can cause a transient service interruption for connected clients. However, in the case
of continuously available workloads such as Hyper-V with live migration or file server with SMB Transparent Failover, CAU can coordinate cluster updates with no impact to the service availability.
Note
The CAU feature is only compatible with Windows Server 2012 R2 and Windows Server 2012 failover clusters and the clustered roles that are supported on those versions.

QUESTION 7
An organization has private and public cloud resources. The organization has Windows Server 2012 R2 servers that have the Hyper-V role installed. You have one four-node cluster of Hyper- V host servers. You use System Center 2012 R2. The virtual machines that run on the cluster must remain online when you install updates on the Hyper-V host servers.
You need to install updates on the Hyper-V host servers. What should you do?
A. Configure Windows Server Update Services (WSUS) to provide updates to the Hyper-V host servers in the cluster.
B. Add all the virtual machines hosted on the cluster to a collection in System Center 2012 R2 Configuration Manager. Deploy updates to the collection.
C. Use the Cluster-Aware Updating (CAU) wizard.
D. Configure Windows Update on the Hyper-V host servers to download updates from Microsoft Update.
74-409 vce Correct Answer: C
Explanation
Explanation/Reference:
CAU is an automated feature that enables you to update clustered servers with little or no loss of availability during the update process. During an Updating Run, CAU transparently performs the following tasks:Puts each node of the cluster into node maintenance mode ?Moves the clustered roles off the node ?Installs the updates and any dependent updates
Performs a restart if necessary
Brings the node out of maintenance mode
Restores the clustered roles on the node
Moves to update the next nodeFor many clustered roles (formerly called clustered applications and services) in the cluster, the automatic update process triggers a planned failover, and it can cause a transient service interruption for connected clients. However, in the case of continuously available workloads such as Hyper-V with live migration or file server with SMB Transparent Failover, CAU can coordinate cluster updates with no impact to the service availability.
Note
The CAU feature is only compatible with Windows Server 2012 R2 and Windows Server 2012 failover clusters and the clustered roles that are supported on those versions.

QUESTION 8
Your environment contains one Active Directory Domain Services (AD DS) domain. All domain controllers have Windows Server 2012 R2 installed. All domain controllers are virtualized domain controllers.
You design a disaster recovery strategy. You have the following requirements:
The domain controllers can be recovered in the event that a Hyper-V host server fails.
The AD DS domain must be restorable to a consistent state.
You must minimize the data loss. You need to ensure that the domain controllers can be recovered in the event of a failure. What should you do?
A. Clone the domain controller that holds the PDC Emulator role to a different Hyper-V host server. Schedule a Windows PowerShell job to run the Checkpoint- VM cmdlet on each virtual domain controller.
B. Run Windows Azure Hyper-V Recovery Manager.
C. On each guest operating system, run Windows Server Backup.
D. On the host operating system, run Windows Server Backup.
E. Schedule a Windows PowerShell job to back up each domain controller’s virtual hard disk (VHD) file.
Correct Answer: C
Explanation

Do you maintain 100% Guarantee on Pass4itsure.com products?

Yes. Our PDF of pass4itsure 74-409 dumps exam is designed to ensure everything which you need to pass your exam successfully. At Pass4itsure.com, we have a completely customer oriented policy. We invite the rich experience and expert knowledge of professionals from the IT certification industry to guarantee the PDF details precisely and logically. Our customers’ time is a precious concern for us. This requires us to provide you the products that can be utilized most efficiently.

Do you offer free after-sale services?

Yes. We provide 7/24 customer help and information on a wide range of issues. Our service is professional and confidential and your issues will be replied within 12 hous. Feel free to send us any questions and we always try our best to keeping our Customers Satisfied.

Do you provide free updates?

Yes, once there are some changes on 74-409 exam, we will update the study materials timely to make sure that our customer can download the latest edition. The updates are provided free for 120 days.

What if I don’t pass the exam? How do I claim Refund?

Any Pass4itsure.com user who fails the corresponding exam has 30 days from the date of purchase of Exam on Pass4itsure.com for a full refund. We can accept and arrange a full refund requests only if your score report or any relevant filed be confirmed.

pass4itsure is the website that provides all candidates with IT certification exam dumps and can help all candidates pass their exam with ease. pass4itsure IT expert edits all-time exam materials together on the basis of flexibly using the experiences of forefathers, thereby writing the best pass4itsure 74-409 dumps test questions.
74-409 dumps

Why Choose Pass4itsure 74-409 Dumps

  • Downloadable, Interactive 74-409 Dumps Testing engines
  • Quality and Value for the 74-409 Dumps
  • Verified Answers Researched by Industry Experts
  • 100% Guarantee to Pass Your 74-409 Dumps
  • 74-409 Dumps Practice Test Questions accompanied by exhibits
  • Drag and Drop questions as experienced in the Actual 74-409 Dumps Exams
  • Our Practice Test Questions are backed by our 100% MONEY BACK GUARANTEE.

pass4itsure 74-409 dumps
Pass4itsure Microsoft 74-409 Dumps Real Demo, 100% Pass Rate Microsoft 74-409 Dumps Exam Video Q&As Online, We Help You Pass Server Virtualization with Windows Server Hyper-V and System Center. Pass4itsure 74-409 Dumps Exam Youtube Free Online Test Here:

Continue Reading

[2018 New Updated] Best Quality Microsoft 74-343 Dumps Microsoft Project Exam Qs&As With 100% Pass Rate Youtube (Question 1 – Question 12)

Which Microsoft 74-343 dumps website is your best choice? pass4itsure 74-343 dumps pdf (Managing Projects with Microsoft Project 2013) is the part of Microsoft certification. Passing Microsoft 74-343 exam in first attempt is easy with the help of Pass4itsure to become Microsoft certified. The Pass4itsure practice exam software offers you a real exam simulation for 74-343 Managing Projects with Microsoft Project 2013 course exam.

Managing Projects with Microsoft Project 2013 (Project 74-343) is a qualifying exam for the Microsoft certification. You can also be able to make use of the audio exam, video exam and brain dumps for 74-343 Managing Projects with Microsoft Project 2013 coaching center is popular.

[2018 New Updated Pass4itsure 74-343 PDF Dumps From Google Drive]: https://drive.google.com/open?id=18sdyImWoGc8PsHpL6S6BUCHeDI7FxruI

[2018 New Updated Pass4itsure 74-409 PDF Dumps From Google Drive]: https://drive.google.com/open?id=14fBjnxAQ9DxW6704zhSaCemc5NPydZ0k

Exam Code: 74-343
Exam Name: Managing Projects with Microsoft Project 2013
Q&As: 343

Pass4itsure Latest and Most Accurate Microsoft 74-343 Dumps Exam Q&As(1-12)

QUESTION 1
You are a project manager who uses Project Standard 2013. You are creating a preliminary project schedule and are estimating the number of resources required prior to finalizing the schedule. You do not have named resources to complete the tasks, but you know the resource roles that are necessary. One of the roles needed is architect. You need to estimate how many architect hours are required to complete the work. What should you do?
A. Add a Material Resource named architect.
B. Add a Budget Resource named architect.
C. Add a Work Resource named architect,
D. Add a Cost Resource named architect.
74-343 exam Correct Answer: C

QUESTION 2
You are a program manager who uses Project Professional 2013. You manage a portfolio of projects for a large point of sale implementation. All of your project managers have created individual project schedules. You discover that you have resource constraints since multiple resources are working on multiple projects. You need visibility into resources across all projects so that you can most efficiently manage the resources and their availability. What should you do?
A. Create a shared resource pool and send the location to each project manager. Open the individual project and the resource pool. From the individual project, select Resource Pool, Share Resources, and choose Use Resources.
B. Create a shared resource pool and send the location to each Project Manager. Open the individual project, select Resource Pool, Share Resources, and choose Use Resources.
C. Create a master resource list and send it to each project manager. Open the individual project and copy and paste it into the Resource Sheet.
D. Create a master resource list and send it to each project manager. Open the individual project, select Team Planner, and add the resources.
Correct Answer: A

QUESTION 3
You are a project manager for a software development company. You use Project Professional 2013. You manage an integration project, and you discover that you need to add additional resources to the integration tasks in order to meet your development complete milestone date. The project is behind schedule, so you must shorten the duration of the integration development work. You identify two additional resources to work on the integration task. When you add these resources, your task now shows it will complete three days ahead of schedule, which leaves a contingency window for issues that may arise. In order to shorten the duration of the task when the resources are added, you need to set the task type before adding the resources. What should you do?
A. Use an automatically scheduled task and set the task type to fixed duration.
B. Use a manually scheduled task and set the task type to fixed work.
C. Use an automatically scheduled task and set the task type to fixed work.
D. Use a manually scheduled task and set the task type to fixed duration.
74-343 dumps Correct Answer: C

QUESTION 4
You are a project manager, and your organization uses Project Professional 2013. You have created a detailed project schedule and have identified two tasks that are causing your resource to be over allocated. You need to use the Team Planner to reassign these tasks from the over allocated resources to under allocated resources with the same skill set. What should you do?
A. Right-click the task and reassign it to the underallocated resource.
B. Drag the underallocated resource on the task to reassign it.
C. Drag one of the tasks from the overallocated resource to the Unassigned Tasks section.
D. Right-click the resource and reassign it to the underallocated resource.
Correct Answer: A

QUESTION 5
Your organization uses Project Professional 2013. A senior stakeholder in a project asks you to determine when a task is over budget by comparing the baseline cost of a task to the cost. Additionally, the senior stakeholder wants you to
display a graphic indicator when the baseline cost is greater than the cost. You write a formula to display the indicator, but it only displays for normal tasks and not for summary tasks. You need to make the indicator display for summary tasks.
Which two actions should you perform? (Each correct answer presents part of the solution. Choose two.)
A. Within the Custom Field, set Calculation for task and group summary rows to Use Formula.
B. Within the Custom Field, set Calculation for task and group summary rows to Maximum.
C. Within the Graphical Indicators dialog box, check the Import Indicator Criteria button.
D. Within the Graphical Indicators dialog box, check Summary rows inherit criteria from nonsummary row.
74-343 pdf Correct Answer: AD

QUESTION 6
You are project manager who uses Project Professional 2013. Your organization uses Microsoft SharePoint 2013 and uses a SharePoint task list to define the tasks required on an upcoming project. The task list contains over 100 items. You need to create a project based on the tasks in the SharePoint list in the most efficient manner. What should you do?
A. Export the tasks into Microsoft Excel and then import the Excel file into Project Professional 2013.
B. Edit the Project Summary Task hyperlink column to point to the SharePoint task list and click the Import button.
C. Open the tasks directly from the SharePoint site into Project Professional 2013.
D. Copy and paste the tasks from SharePoint into Project Professional 2013.
Correct Answer: C

QUESTION 7
You are a resource manager who uses Project Standard 2013. You manage all of your resources in a single plan, which acts as a Shared Resource Pool for other projects in your organization. Each resource needs to pass an annual exam in order to work on construction sites. You need to set up a method that allows you to pick the renewal month for each resource. What should you do?
A. Rename the Resource Text1 Custom field to Exam Expiration Date. Enter the month when the exam expires. Select the correct expiration date for each resource.
B. Use the Organizer to copy the Resource Finish1 Custom field from the Global.mpt. Select the correct expiration date for each resource.
C. Rename the Resource Date1 Custom field to Exam Expiration Date. Create a Lookup table with values containing the last date of each month. Select the correct expiration date for each exam.
D. Rename the Resource Month1 Custom field to Exam Expiration Date. Create a Lookup table with monthly values. Select the correct expiration month for each exam.
E. Rename the Resource Flag1 Custom field to Exam Expired Date. Enter the expiration dates into a Lookup table. Select the correct expiration date for each resource.
74-343 vce Correct Answer: C

QUESTION 8
You are a project manager who uses Project Standard 2013, and your task list includes a flag field that indicates, with Yes or No, if a non-summary task represents a physical deliverable. Your project involves several tasks marked as deliverables, and management requires you to track how many deliverables are completed. The deliverable is considered completed when the Percent complete field is 100%. You need to create a formula to calculate the total number of deliverables that are completed. Which two steps should you perform? (Each correct answer presents part of the solution. Choose two.)
A. Use the following formula: IIf([Physical Deliverable]=Yes And [% Complete]=100,1,0).
B. Set Calculation for tasks and summary groups to Sum.
C. Use the following formula: IIf([Physical Deliverable]=Yes And [% Complete]=100,0,1).
D. Set Calculation for tasks and summary groups to Count All.
Correct Answer: AB

QUESTION 9
You are a project manager who uses Project Professional 2013. A senior stakeholder asks you to update your project to reflect your organization’s scheduled two-week closure. You need to reflect the closure within your schedule. What should you do?
A. Create a resource and specify non-working days for the resource which reflect the closure. Assign this resource to each task.
B. Open the Project Calendar and modify the default work week by setting the dates as non-working time.
C. Create a new calendar and assign this to the tasks that are scheduled over the period of closure.
D. Open the Project Calendar and enter the planned closure in the Exceptions tab.
Correct Answer: D

QUESTION 10
You manage a project by using Project Standard 2013. You need to use the Baseline2 fields to calculate Variance at Completion (VAC). You have already set Baseline2. What should you do?
A. Enter physical percent complete for the tasks that have actual values. Set the Baseline to the Baseline2, and reschedule uncompleted work based on the status date.
B. Change the Earned Value method to Baseline2 in the Task Information Form.
Enter tracking data, and view the VAC on the Earned Value table.
C. Change the Baseline for Earned Value calculation option to Baseline2, and reschedule uncompleted work based on the status date.
D. Go to the Earned Value table and insert the Baseline2 column. Recalculate the project.
74-343 exam Correct Answer: C

QUESTION 11
You are a project manager who uses Project Professional 2013. When viewing the critical path, you notice that there are some inconsistencies. To investigate the status of the critical path, you insert the Total Slack column into a task table. You discover that many of the tasks have negative Total Slack values. You need to resolve the negative Total Slack values. What should you do?
A. Remove lag time from task relationships.
B. Remove as many constraints as possible.
C. Re-assign resources that have more availability at the time of the negative slack.
D. Remove lead time from the task relationships.
Correct Answer: B

QUESTION 12
You manage a project by using Project Professional 2013. The work variance for a task is 48 hours. The remaining work is 25 hours. The work for this task has been completed. You need the work variance to be adjusted to reflect what has occurred during the performance of the task. What should you do?
A. Adjust the value in the Baseline Work column.
B. Enter a 0 in the remaining Duration column.
C. Adjust the value in the Work Variance column.
D. Mark the task inactive.
74-343 dumps Correct Answer: B

Do you maintain 100% Guarantee on Pass4itsure.com products?

Yes. Our PDF of pass4itsure 74-343 dumps exam is designed to ensure everything which you need to pass your exam successfully. At Pass4itsure.com, we have a completely customer oriented policy. We invite the rich experience and expert knowledge of professionals from the IT certification industry to guarantee the PDF details precisely and logically. Our customers’ time is a precious concern for us. This requires us to provide you the products that can be utilized most efficiently.

Do you offer free after-sale services?

Yes. We provide 7/24 customer help and information on a wide range of issues. Our service is professional and confidential and your issues will be replied within 12 hous. Feel free to send us any questions and we always try our best to keeping our Customers Satisfied.

Do you provide free updates?

Yes, once there are some changes on 74-343 exam, we will update the study materials timely to make sure that our customer can download the latest edition. The updates are provided free for 120 days.

What if I don’t pass the exam? How do I claim Refund?

Any Pass4itsure.com user who fails the corresponding exam has 30 days from the date of purchase of Exam on Pass4itsure.com for a full refund. We can accept and arrange a full refund requests only if your score report or any relevant filed be confirmed.

pass4itsure is the website that provides all candidates with IT certification exam dumps and can help all candidates pass their exam with ease. pass4itsure IT expert edits all-time exam materials together on the basis of flexibly using the experiences of forefathers, thereby writing the best pass4itsure 74-343 dumps test questions.
74-343 dumps

Why Choose Pass4itsure 74-343 Dumps

  • Downloadable, Interactive 74-343 Dumps Testing engines
  • Quality and Value for the 74-343 Dumps
  • Verified Answers Researched by Industry Experts
  • 100% Guarantee to Pass Your 74-343 Dumps
  • 74-343 Dumps Practice Test Questions accompanied by exhibits
  • Drag and Drop questions as experienced in the Actual 74-343 Dumps Exams
  • Our Practice Test Questions are backed by our 100% MONEY BACK GUARANTEE.

pass4itsure 74-343 dumps
Best Quality Microsoft 74-343 Dumps Exam Download, Real Microsoft 74-343 Dumps Qs&As With 100% Pass Rate, We Help You Pass Managing Projects with Microsoft Project 2013. Pass4itsure 74-343 Dumps Exam Youtube Free Online Test Here:

Continue Reading

[2018 New Updated] 100% Success Rate EC-COUNCIL 712-50 Dumps Exam Qs&As Video With Accurate Answers (Question 1 – Question 26)

Check if you are ready to pass 712-50 dumps exam or not? pass4itsure 712-50 dumps exam (EC-Council Certified CISO (CCISO)) is the part of EC-COUNCIL certification. Passing EC-COUNCIL 712-50 exam in first attempt is easy with the help of Pass4itsure to become EC-COUNCIL certified. The Pass4itsure practice exam software offers you a real exam simulation for 200-105 EC-Council Certified CISO (CCISO) course exam.

EC-Council Certified CISO (CCISO) (CCISO 712-50) is a qualifying exam for the EC-COUNCIL certification. You can also be able to make use of the audio exam, video exam and brain dumps for 712-50 dumps EC-Council Certified CISO (CCISO) coaching center is popular.

[2018 New Updated Pass4itsure 712-50 PDF Dumps From Google Drive]: https://drive.google.com/open?id=1-MjU6oJH8gscpAMif3u5JrXLEHU0exaf

[2018 New Updated Pass4itsure 74-343 PDF Dumps From Google Drive]: https://drive.google.com/open?id=18sdyImWoGc8PsHpL6S6BUCHeDI7FxruI

Exam Code: 712-50
Exam Name: EC-Council Certified CISO (CCISO)
Q&As: 343

Pass4itsure Latest and Most Accurate EC-COUNCIL 712-50 Dumps Exam Q&As(1-26)

QUESTION 1
When dealing with risk, the information security practitioner may choose to:
A. assign
B. transfer
C. acknowledge
D. defer
712-50 exam Correct Answer: C

QUESTION 2
According to the National Institute of Standards and Technology (NIST) SP 800-40, which of the following considerations are MOST important when creating a vulnerability management program?
A. Susceptibility to attack, mitigation response time, and cost
B. Attack vectors, controls cost, and investigation staffing needs
C. Vulnerability exploitation, attack recovery, and mean time to repair
D. Susceptibility to attack, expected duration of attack, and mitigation availability
Correct Answer: A

QUESTION 3
Acme Inc. has engaged a third party vendor to provide 99.999% up-time for their online web presence and had them contractually agree to this service level agreement. What type of risk tolerance is Acme exhibiting? (choose the BEST
answer):
A. low risk-tolerance
B. high risk-tolerance
C. moderate risk-tolerance
D. medium-high risk-tolerance
712-50 dumps Correct Answer: A

QUESTION 4
Which of the following is a major benefit of applying risk levels?
A. Risk management governance becomes easier since most risks remain low once mitigated
B. Resources are not wasted on risks that are already managed to an acceptable level
C. Risk budgets are more easily managed due to fewer identified risks as a result of using a methodology
D. Risk appetite can increase within the organization once the levels are understood
Correct Answer: B

QUESTION 5
To get an Information Security project back on schedule, which of the following will provide the MOST help?
A. Upper management support
B. More frequent project milestone meetings
C. Stakeholder support
D. Extend work hours
712-50 pdf Correct Answer: A

QUESTION 6
The process to evaluate the technical and non-technical security controls of an IT system to validate that a given design
and implementation meet a specific set of security requirements is called
A. Security certification
B. Security system analysis
C. Security accreditation
D. Alignment with business practices and goals.
Correct Answer: A

QUESTION 7
When managing the security architecture for your company you must consider:
A. Security and IT Staff size
B. Company Values
C. Budget
D. All of the above
712-50 vce Correct Answer: D

QUESTION 8
Which of the following is a term related to risk management that represents the estimated frequency at which a threat is
expected to transpire?
A. Single Loss Expectancy (SLE)
B. Exposure Factor (EF)
C. Annualized Rate of Occurrence (ARO)
D. Temporal Probability (TP)
Correct Answer: C

QUESTION 9
You have recently drafted a revised information security policy. From whom should you seek endorsement in order to have the GREATEST chance for adoption and implementation throughout the entire organization?
A. Chief Information Security Officer
B. Chief Executive Officer
C. Chief Information Officer
D. Chief Legal Counsel
712-50 exam Correct Answer: B

QUESTION 10
Scenario: Your organization employs single sign-on (user name and password only) as a convenience to your employees to access organizational systems and data. Permission to individual systems and databases is vetted and approved through supervisors and data owners to ensure that only approved personnel can use particular applications or retrieve information. All employees have access to their own human resource information, including the ability to change their bank routing and account information and other personal details through the Employee Self-Service application. All employees have access to the organizational VPN. What type of control is being implemented by supervisors and data owners?
A. Management
B. Operational
C. Technical
D. Administrative
Correct Answer: B

QUESTION 11
You manage a newly created Security Operations Center (SOC), your team is being inundated with security alerts and don\’t know what to do. What is the BEST approach to handle this situation?
A. Tell the team to do their best and respond to each alert
B. Tune the sensors to help reduce false positives so the team can react better
C. Request additional resources to handle the workload
D. Tell the team to only respond to the critical and high alerts
712-50 dumps Correct Answer: B

QUESTION 12
Within an organization\’s vulnerability management program, who has the responsibility to implement remediation actions?
A. Security officer
B. Data owner
C. Vulnerability engineer
D. System administrator
Correct Answer: D

QUESTION 13
Scenario: Most industries require compliance with multiple government regulations and/or industry standards to meet data protection and privacy mandates. When multiple regulations or standards apply to your industry you should set controls to meet the:
A. Easiest regulation or standard to implement
B. Stricter regulation or standard
C. Most complex standard to implement
D. Recommendations of your Legal Staff
712-50 pdf Correct Answer: A

QUESTION 14
When dealing with Security Incident Response procedures, which of the following steps come FIRST when reacting to an incident?
A. Escalation
B. Recovery
C. Eradication
D. Containment
Correct Answer: D

QUESTION 15
Which of the following is a weakness of an asset or group of assets that can be exploited by one or more threats?
A. Threat
B. Vulnerability
C. Attack vector
D. Exploitation
712-50 vce Correct Answer: B

QUESTION 16
What are the primary reasons for the development of a business case for a security project?
A. To estimate risk and negate liability to the company
B. To understand the attack vectors and attack sources
C. To communicate risk and forecast resource needs
D. To forecast usage and cost per software licensing
Correct Answer: C

QUESTION 17
An organization is required to implement background checks on all employees with access to databases containing credit card information. This is considered a security
A. Procedural control
B. Management control
C. Technical control
D. Administrative control
712-50 exam Correct Answer: B

QUESTION 18
Scenario: Your program is developed around minimizing risk to information by focusing on people, technology, and operations.
An effective way to evaluate the effectiveness of an information security awareness program for end users, especially senior executives, is to conduct periodic:
A. Controlled spear phishing campaigns
B. Password changes
C. Baselining of computer systems
D. Scanning for viruses
Correct Answer: A

QUESTION 19
SQL injection is a very popular and successful injection attack method. Identify the basic SQL injection text:
A. ` o 1=1 –
B. /../../../../
C. andquot;DROPTABLE USERNAMEandquot;
D. NOPS
712-50 dumps Correct Answer: A

QUESTION 20
When measuring the effectiveness of an Information Security Management System which one of the following would be MOST LIKELY used as a metric framework?
A. ISO 27001
B. PRINCE2
C. ISO 27004
D. ITILv3
Correct Answer: C

QUESTION 21
An organization has defined a set of standard security controls. This organization has also defined the circumstances and conditions in which they must be applied. What is the NEXT logical step in applying the controls in the organization?
A. Determine the risk tolerance
B. Perform an asset classification
C. Create an architecture gap analysis
D. Analyze existing controls on systems
712-50 pdf Correct Answer: B

QUESTION 22
The risk found after a control has been fully implemented is called:
A. Residual Risk
B. Total Risk
C. Post implementation risk
D. Transferred risk
Correct Answer: A

QUESTION 23
SCENARIO: A Chief Information Security Officer (CISO) recently had a third party conduct an audit of the security program. Internal policies and international standards were used as audit baselines. The audit report was presented to the CISO and a variety of high, medium and low rated gaps were identified. The CISO has implemented remediation activities. Which of the following is the MOST logical next step?
A. Validate the effectiveness of applied controls
B. Validate security program resource requirements
C. Report the audit findings and remediation status to business stake holders
D. Review security procedures to determine if they need modified according to findings
712-50 vce Correct Answer: A

QUESTION 24
Scenario: Your organization employs single sign-on (user name and password only) as a convenience to your employees to access organizational systems and data. Permission to individual systems and databases is vetted and approved through supervisors and data owners to ensure that only approved personnel can use particular applications or retrieve information. All employees have access to their own human resource information, including the ability to change their bank routing and account information and other personal details through the Employee Self-Service application. All employees have access to the organizational VPN. Recently, members of your organization have been targeted through a number of sophisticated phishing attempts and have compromised their system credentials. What action can you take to prevent the misuse of compromised credentials to change bank account information from outside your organization while still allowing employees to manage
their bank information?
A. Turn off VPN access for users originating from outside the country
B. Enable monitoring on the VPN for suspicious activity
C. Force a change of all passwords
D. Block access to the Employee-Self Service application via VPN
Correct Answer: D

QUESTION 25
Which of the following BEST describes an international standard framework that is based on the security model Information Technology–Code of Practice for Information Security Management?
A. International Organization for Standardization 27001
B. National Institute of Standards and Technology Special Publication SP 800-12
C. Request For Comment 2196
D. National Institute of Standards and Technology Special Publication SP 800-26
712-50 exam Correct Answer: A

QUESTION 26
A system was hardened at the Operating System level and placed into the production environment. Months later an audit was performed and it identified insecure configuration different from the original hardened state. Which of the following security issues is the MOST likely reason leading to the audit findings?
A. Lack of asset management processes
B. Lack of change management processes
C. Lack of hardening standards
D. Lack of proper access controls
Correct Answer: B

Do you maintain 100% Guarantee on Pass4itsure.com products?

Yes. Our PDF of pass4itsure 712-50 dumps exam is designed to ensure everything which you need to pass your exam successfully. At Pass4itsure.com, we have a completely customer oriented policy. We invite the rich experience and expert knowledge of professionals from the IT certification industry to guarantee the PDF details precisely and logically. Our customers’ time is a precious concern for us. This requires us to provide you the products that can be utilized most efficiently.

Do you offer free after-sale services?

Yes. We provide 7/24 customer help and information on a wide range of issues. Our service is professional and confidential and your issues will be replied within 12 hous. Feel free to send us any questions and we always try our best to keeping our Customers Satisfied.

Do you provide free updates?

Yes, once there are some changes on 712-50 exam, we will update the study materials timely to make sure that our customer can download the latest edition. The updates are provided free for 120 days.

What if I don’t pass the exam? How do I claim Refund?

Any Pass4itsure.com user who fails the corresponding exam has 30 days from the date of purchase of Exam on Pass4itsure.com for a full refund. We can accept and arrange a full refund requests only if your score report or any relevant filed be confirmed.

pass4itsure is the website that provides all candidates with IT certification exam dumps and can help all candidates pass their exam with ease. pass4itsure IT expert edits all-time exam materials together on the basis of flexibly using the experiences of forefathers, thereby writing the best pass4itsure 712-50 dumps test questions.

712-50 dumps

Why Choose Pass4itsure 712-50 Dumps

  • Downloadable, Interactive 712-50 Dumps Testing engines
  • Quality and Value for the 712-50 Dumps
  • Verified Answers Researched by Industry Experts
  • 100% Guarantee to Pass Your 712-50 Dumps
  • 712-50 Dumps Practice Test Questions accompanied by exhibits
  • Drag and Drop questions as experienced in the Actual 712-50 Dumps Exams
  • Our Practice Test Questions are backed by our 100% MONEY BACK GUARANTEE.

pass4itsure 712-50 dumps
Pass4itsure EC-COUNCIL 712-50 Dumps Exam Download, 100% Success Rate EC-COUNCIL 712-50 Dumps Video Qs&As With Accurate Answers, We Help You Pass EC-Council Certified CISO (CCISO). 

Continue Reading